MER · EV charging site
Boscombe, Hawkwood Road Car Park
Boscombe, Hawkwood Road Car Park, Bournemouth, BH5 1BY
Boscombe, Hawkwood Road Car Park is an EV charging site in Bournemouth, Bournemouth, Christchurch and Poole Council, run by MER. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Sovereign Retail Park (InstaVolt Ltd), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Boscombe, Hawkwood Road Car Park (MER)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Boscombe, Hawkwood Road Car Park (MER) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Boscombe, Hawkwood Road Car Park?
Boscombe, Hawkwood Road Car Park is on the MER network.
Where is the nearest other charger with 50 kW or more to Boscombe, Hawkwood Road Car Park (MER)?
Sovereign Retail Park (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Boscombe, Hawkwood Road Car Park (MER)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Boscombe, Hawkwood Road Car Park (MER)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Boscombe, Hawkwood Road Car Park (MER)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sovereign Retail Park
- Overstrand Car Park 1
- Overstrand Car Park 2
- Kings Park Car Park
- Woodside Road Car Park
- Rawowned Pines 1
- Cheapest nearby
- Overstrand Car Park 1 · 59p per kWh · 22 kW · 0.5 mi
- Fastest nearby
- Overstrand Car Park 2 · 150 kW · 0.5 mi