MER · EV charging site
Energus
Blackwood Road, Workington, CA14 4JW
Energus is an EV charging site in Workington, Cumbria, run by MER. All 4 of its sockets are 22 kW Type 2, and the price is listed as 36p per kW. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is EG GROUP EG LILLYHALL (ChargePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Price
- 36p per kW(from Open Charge Map, 5 Apr 2026)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Energus (MER)?
The listed price is 36p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Energus (MER)?
Up to 22 kW AC via Type 2.
How many charging sockets does Energus (MER) have?
4 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Energus?
Energus is on the MER network.
Where is the nearest charger with 50 kW or more to Energus (MER)?
EG GROUP EG LILLYHALL (ChargePoint) is 1 mile away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Energus (MER)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Energus (MER)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Energus (MER)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lakes College
- EG Group EG Lillyhall
- Community Diagnostics Centre
- Morrisons, Workington
- Pod Point Cumberland Council - Workington Transport Hub
- Workington - Allerdale Borough Council
- Cheapest nearby
- Pod Point Cumberland Council - Workington Transport Hub · 50.4p per kWh · 7 kW · 2.5 mi
- Fastest nearby
- Morrisons, Workington · 300 kW · 2.5 mi