MER · EV charging site
HCC Basingstoke Railway Station Car Park
Clifton Terrace, Basingstoke, RG21 7QY
HCC Basingstoke Railway Station Car Park is an EV charging site in Basingstoke, Hampshire, run by MER. Its 2 sockets reach up to 100 kW, with CHAdeMO at the top speed, and the price is listed as £0.78/kWh. 15 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Central Car Park, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.78/kWh(from Open Charge Map, 23 Jun 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at HCC Basingstoke Railway Station Car Park (MER)?
The listed price is £0.78/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at HCC Basingstoke Railway Station Car Park (MER)?
Up to 100 kW DC via CHAdeMO, CCS.
How many charging sockets does HCC Basingstoke Railway Station Car Park (MER) have?
2 charging sockets: 1 × 100 kW CHAdeMO, 1 × 50 kW CCS.
Who operates HCC Basingstoke Railway Station Car Park?
HCC Basingstoke Railway Station Car Park is on the MER network.
Where is the nearest other charger with 50 kW or more to HCC Basingstoke Railway Station Car Park (MER)?
Central Car Park is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HCC Basingstoke Railway Station Car Park (MER)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HCC Basingstoke Railway Station Car Park (MER)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HCC Basingstoke Railway Station Car Park (MER)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.