MER · EV charging site
Howard's Lane Car Park
Howard's Lane, Poole, BH20 4HU
Howard's Lane Car Park is an EV charging site in Poole, Bournemouth, Christchurch and Poole Council, run by MER. It has a single 120 kW CCS socket. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Rempstone Centre (Be.EV), 150 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Howard's Lane Car Park (MER)?
Up to 120 kW DC via CCS.
How many charging sockets does Howard's Lane Car Park (MER) have?
1 charging socket: 1 × 120 kW CCS.
Who operates Howard's Lane Car Park?
Howard's Lane Car Park is on the MER network.
Where is the nearest other charger with 50 kW or more to Howard's Lane Car Park (MER)?
Rempstone Centre (Be.EV) is 150 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Howard's Lane Car Park (MER)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Howard's Lane Car Park (MER)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Howard's Lane Car Park (MER)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Bonnets Lane Car Park · 59p per kWh · 22 kW · 60 yd