MER · EV charging site
Lambourn High Street Car Park
High Street, Swindon, RG17 8XL
Lambourn High Street Car Park is an EV charging site in Swindon, Borough of Swindon, run by MER. Both of its sockets are 22 kW Type 2, and the price is listed as £0.45/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Membury, UK - Eastbound (Tesla), 1.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Price
- £0.45/kWh(from Open Charge Map, 2 Sept 2025)
- Notes
- app or web portal to start charge, or roaming RFID
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lambourn High Street Car Park (MER)?
The listed price is £0.45/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lambourn High Street Car Park (MER)?
Up to 22 kW AC via Type 2.
How many charging sockets does Lambourn High Street Car Park (MER) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Lambourn High Street Car Park?
Lambourn High Street Car Park is on the MER network.
Where is the nearest charger with 50 kW or more to Lambourn High Street Car Park (MER)?
Membury, UK - Eastbound (Tesla) is 1.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lambourn High Street Car Park (MER)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lambourn High Street Car Park (MER)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lambourn High Street Car Park (MER)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Membury, UK - Eastbound
- EH - Welcome Break Membury Eastbound
- Membury, UK - Westbound
- EH - Welcome Break Membury Westbound
- Tap Zap Go - Membury Services at Lambourn Woodlands
- Cheapest nearby
- Membury, UK - Eastbound · 29p per kWh · 150 kW · 1.9 mi
- Fastest nearby
- Membury, UK - Eastbound · 150 kW · 1.9 mi