MER · EV charging site
Newbury Central Car Park
Wharf Road, Newbury, RG14 5QP
Newbury Central Car Park is an EV charging site in Newbury, West Berkshire, run by MER. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.45/kWh. 54 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Burger King Newbury (Be.EV), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.45/kWh(from Open Charge Map, 24 Aug 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Newbury Central Car Park (MER)?
The listed price is £0.45/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Newbury Central Car Park (MER)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Newbury Central Car Park (MER) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Newbury Central Car Park?
Newbury Central Car Park is on the MER network.
Where is the nearest other charger with 50 kW or more to Newbury Central Car Park (MER)?
Burger King Newbury (Be.EV) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newbury Central Car Park (MER)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newbury Central Car Park (MER)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newbury Central Car Park (MER)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Newbury Library Car Park
- Kennet Centre Multi-Storey Car Park
- ubitricity Distributed Energy Systems UK Ltd. 6 Connaught Road
- ubitricity Distributed Energy Systems UK Ltd. 24 Connaught Road,
- Newbury Station Car Park - Newbury
- ubitricity Distributed Energy Systems UK Ltd. 67 Kings Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 6 Connaught Road · 56p per kWh · 5 kW · 0.2 mi