MER · EV charging site
Northcroft Lane Leisure Centre
Northcroft Lane, Newbury, RG14 1RS
Northcroft Lane Leisure Centre is an EV charging site in Newbury, West Berkshire, run by MER. Both of its sockets are 22 kW Type 2, and the price is listed as £0.30/kWh. 42 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Starting Gate, Newbury (Osprey Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh(from Open Charge Map, 12 Jun 2022)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Northcroft Lane Leisure Centre (MER)?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Northcroft Lane Leisure Centre (MER)?
Up to 22 kW AC via Type 2.
How many charging sockets does Northcroft Lane Leisure Centre (MER) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Northcroft Lane Leisure Centre?
Northcroft Lane Leisure Centre is on the MER network.
Where is the nearest charger with 50 kW or more to Northcroft Lane Leisure Centre (MER)?
The Starting Gate, Newbury (Osprey Charging) is 0.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Northcroft Lane Leisure Centre (MER)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northcroft Lane Leisure Centre (MER)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northcroft Lane Leisure Centre (MER)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 19 West Mills
- ubitricity Distributed Energy Systems UK Ltd. 12 West Mills
- ubitricity Distributed Energy Systems UK Ltd. 1 Rockingham Road
- Regus Newbury
- ubitricity Distributed Energy Systems UK Ltd. 41 Craven Road
- ubitricity Distributed Energy Systems UK Ltd. 11 Rockingham Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 19 West Mills · 45p per kWh · 5 kW · 0.3 mi
- Fastest nearby
- Regus Newbury · 25 kW · 0.3 mi