Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Pound Lane Car Park

Millhams Road, Ferndown, BH10 7LN

Pound Lane Car Park is an EV charging site in Ferndown, Dorset, run by Be.EV and open 24 hours a day. Both of its sockets are 50 kW CHAdeMO and CCS, and the published price is £0.84 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 96% uptime and recorded 56 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Kinson, 130 yards away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 84p per kWh1 free
TR0020-193% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 84p per kWh1 free
TR0020-298% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
TR0020-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO50 kW84p per kWh
CCS50 kW84p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pound Lane Car Park (Be.EV)?

The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pound Lane Car Park (Be.EV)?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does Pound Lane Car Park (Be.EV) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Pound Lane Car Park (Be.EV) open 24/7?

Yes - Pound Lane Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Pound Lane Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pound Lane Car Park (Be.EV)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 56 observed charging sessions.

Who operates Pound Lane Car Park?

Pound Lane Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Pound Lane Car Park (Be.EV)?

Pod Point Tesco Superstore - Kinson is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pound Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pound Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pound Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.