MER · EV charging site
Station Road Car Park
Station Road, Devizes, SN10 1AN
Station Road Car Park is an EV charging site in Devizes, Wiltshire (SN10 1AN), run by MER. Both of its sockets are 7 kW Type 2. Amp Map lists 1 other charge point named Station Road Car Park in Devizes. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is SSE Charging EV Hub Melksham, 5.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.52/kWh. Parking fees apply.(from Open Charge Map, 20 Sept 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Station Road Car Park (MER)?
The listed price is £0.52/kWh. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Station Road Car Park (MER)?
Up to 7 kW AC via Type 2.
How many charging sockets does Station Road Car Park (MER) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Station Road Car Park?
Station Road Car Park is on the MER network.
Where is the nearest charger with 50 kW or more to Station Road Car Park (MER)?
SSE Charging EV Hub Melksham is 5.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Station Road Car Park (MER)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Station Road Car Park (MER)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Station Road Car Park (MER)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Station Road Car Park · 22 kW · 150 yd