MER · EV charging site
Unit 1, Station Yard
Station Road, Newbury, RG17 0DY
Unit 1, Station Yard is an EV charging site in Newbury, West Berkshire, run by MER. Both of its sockets are 22 kW Type 2, and the price is listed as £0.39/kWh. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Church Street Short Stay Car Park (Evolt), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Customers only
- Price
- £0.39/kWh(from Open Charge Map, 2 Oct 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Unit 1, Station Yard (MER)?
The listed price is £0.39/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Unit 1, Station Yard (MER)?
Up to 22 kW AC via Type 2.
How many charging sockets does Unit 1, Station Yard (MER) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Unit 1, Station Yard?
Unit 1, Station Yard is on the MER network.
Can anyone charge at Unit 1, Station Yard (MER)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Unit 1, Station Yard (MER)?
Church Street Short Stay Car Park (Evolt) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Unit 1, Station Yard (MER)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Unit 1, Station Yard (MER)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Unit 1, Station Yard (MER)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 30 Park Street
- ubitricity Distributed Energy Systems UK Ltd. 112a High Street, Lancaster House
- ubitricity Distributed Energy Systems UK Ltd. 40 High Street
- ubitricity Distributed Energy Systems UK Ltd. 13 Bridge Street
- ubitricity Distributed Energy Systems UK Ltd. 47 High Street
- Church Street Short Stay Car Park
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 30 Park Street · 56p per kWh · 5 kW · 170 yd
- Fastest nearby
- Church Street Short Stay Car Park · 50 kW · 0.3 mi