MER · EV charging site
Westbourne, Seamoor Road
Seamoor Road, Bournemouth, BH12 1AZ
Westbourne, Seamoor Road is an EV charging site in Bournemouth, Bournemouth, Christchurch and Poole Council, run by MER. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.78/kWh. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Poole Road (Be.EV), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.78/kWh(from Open Charge Map, 22 Feb 2024)
- Getting there
- Positioned at the far end of Poole Road, visible from the roundabout.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Westbourne, Seamoor Road (MER)?
The listed price is £0.78/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Westbourne, Seamoor Road (MER)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Westbourne, Seamoor Road (MER) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Westbourne, Seamoor Road?
Westbourne, Seamoor Road is on the MER network.
Where is the nearest other charger with 50 kW or more to Westbourne, Seamoor Road (MER)?
Poole Road (Be.EV) is 10 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Westbourne, Seamoor Road (MER)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westbourne, Seamoor Road (MER)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Westbourne, Seamoor Road (MER)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Poole Road
- Alumnhurst Car Park
- Milburn Road Long Stay
- Milburn Road
- Landseer Road Car Park
- Pod Point Tesco Superstore - Poole Branksome
- Cheapest nearby
- Pod Point Tesco Superstore - Poole Branksome · 44.4p per kWh · 50 kW · 0.4 mi
- Fastest nearby
- Milburn Road · 150 kW · 0.2 mi