Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

MER · EV charging site

Wiltshire Council - Pewsey Leisure Centre

Wilcot Road, Devizes, SN9 5EL

Wiltshire Council - Pewsey Leisure Centre is an EV charging site in Devizes, Wiltshire, run by MER. Both of its sockets are 22 kW Type 2, and the price is listed as £0.52/kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Waitrose - Marlborough, 5.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 6 Jun 2023Last verified 6 Jun 2023

Connectors

Type 2 · 22 kW2 connectors

Site information

Operator
MER
Opening hours
Not published
Access
Public · membership required · access key required
Price
£0.52/kWh(from Open Charge Map, 6 Jun 2023)

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Wiltshire Council - Pewsey Leisure Centre (MER)?

The listed price is £0.52/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Wiltshire Council - Pewsey Leisure Centre (MER)?

Up to 22 kW AC via Type 2.

How many charging sockets does Wiltshire Council - Pewsey Leisure Centre (MER) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

Who operates Wiltshire Council - Pewsey Leisure Centre?

Wiltshire Council - Pewsey Leisure Centre is on the MER network.

Where is the nearest charger with 50 kW or more to Wiltshire Council - Pewsey Leisure Centre (MER)?

Shell Recharge EV Waitrose - Marlborough is 5.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wiltshire Council - Pewsey Leisure Centre (MER)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wiltshire Council - Pewsey Leisure Centre (MER)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wiltshire Council - Pewsey Leisure Centre (MER)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 6 Jun 2023

Amp Map does not take payment. You pay the operator.