# MFG EV Power ESSO A46 north-eastbound

Web page: https://ampmap.co.uk/charger/mfg-ev-power-esso-a46-north-eastbound-uk

MFG EV Power ESSO A46 north-eastbound is an EV charging site in Newark on Trent, Nottinghamshire, run by MFG EV Power. Its 8 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.79/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Esso A46, NG24 2DF
- **Area:** Newark on Trent, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.09659, -0.78265

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 8 | Not listed |
| CHAdeMO | 100 kW | 8 | Not listed |

- **Price:** £0.79/kWh (from Open Charge Map)

## Site information

- **Operator:** MFG EV Power
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at MFG EV Power ESSO A46 north-eastbound?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at MFG EV Power ESSO A46 north-eastbound?

Up to 150 kW DC via CCS, CHAdeMO.

### How many charging sockets does MFG EV Power ESSO A46 north-eastbound have?

8 charging sockets: 8 × 150 kW CCS, 8 × 100 kW CHAdeMO.

### Who operates MFG EV Power ESSO A46 north-eastbound?

MFG EV Power ESSO A46 north-eastbound is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.

### How long does a Tesla Model Y Long Range take to charge at MFG EV Power ESSO A46 north-eastbound?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG EV Power ESSO A46 north-eastbound?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at MFG EV Power ESSO A46 north-eastbound?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent)
- [Cheapest charging in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent/cheapest)
- [MFG EV Power chargers](https://ampmap.co.uk/networks/mfg-ev-power)

## Chargers near this site

- [Shell Recharge Shell Little Waitrose Newark](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-newark-uk) - CCS / CHAdeMO 180 kW · Winthorpe Roundabout · From 85p/kWh
- [Northgate Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-northgate-retail-park-uk) - CCS 150 kW · Trent Lane · From 89p/kWh
- [Newark, UK · Tesla](https://ampmap.co.uk/charger/tesla-newark-uk) - CCS 250 kW · N Gate · From 23p/kWh
- [Maltings Retail Park, Newark · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-the-maltings-retail-park-uk) - CCS 150 kW · North Gate · From 89p/kWh
- [Morrisons Newark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-newark-uk) - CHAdeMO 50 kW, Type 2 50 kW · Wm Morrison Supermarkets PLC
- [Appleton Gate Car-Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-appleton-gate-car-park-newark-uk) - CCS 50 kW · 43 Appleton Gate · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/mfg-ev-power-esso-a46-north-eastbound-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 13 Sept 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
