MFG EV Power · EV charging site
MFG Creekmoor
Safety Drive, Poole, BH17 7FR
MFG Creekmoor is an EV charging site in Poole, Bournemouth, Christchurch and Poole Council, run by MFG EV Power. Its 4 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.79/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Toby Carvery Poole (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 27 Feb 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Creekmoor (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Creekmoor (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Creekmoor (MFG EV Power) have?
4 charging sockets: 4 × 150 kW CCS, 4 × 100 kW CHAdeMO.
Who operates MFG Creekmoor?
MFG Creekmoor is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Creekmoor (MFG EV Power)?
Toby Carvery Poole (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Creekmoor (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Creekmoor (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Creekmoor (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Waterloo Road
- Toby Carvery Poole
- Upton Country Park Welcome Centre
- Shell Recharge Shell Darbys Corner
- The Anchorage
- Serpentine Lane
- Cheapest nearby
- Pod Point Tesco Extra - Waterloo Road · 44.4p per kWh · 7 kW · 0.4 mi
- Fastest nearby
- Shell Recharge Shell Darbys Corner · 300 kW · 1 mi