MFG EV Power · EV charging site
MFG Dyce
Wellheads Road, Aberdeen, AB21 7HG
MFG Dyce is an EV charging site in Aberdeen, Aberdeen City, run by MFG EV Power. It has a single socket, with CCS at up to 300 kW, and the price is listed as £0.79/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Dyce Farm (Aberdeen) (evyve), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 9 Oct 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Dyce (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Dyce (MFG EV Power)?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Dyce (MFG EV Power) have?
1 charging socket: 3 × 150 kW CCS, 4 × 50 kW CHAdeMO, 2 × 300 kW CCS.
Who operates MFG Dyce?
MFG Dyce is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Dyce (MFG EV Power)?
Dyce Farm (Aberdeen) (evyve) is 0.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Dyce (MFG EV Power)?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Dyce (MFG EV Power)?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Dyce (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Dyce Train Station
- Dyce Farm (Aberdeen)
- Arjo Wiggins Fine Papers Ltd
- Pod Point Norco Group Ltd
- Dyce (Craibstone) Park & Ride, Craibstone
- Sclattie Park Car Park
- Cheapest nearby
- Pod Point Norco Group Ltd · 57.6p per kWh · 7 kW · 1 mi