# MFG Howe Green · MFG EV Power

Web page: https://ampmap.co.uk/charger/mfg-ev-power-mfg-howe-green-uk

MFG Howe Green is an EV charging site in Royston, Hertfordshire, run by MFG EV Power. Its 8 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.79/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Baldock Road, SG9 9EG
- **Area:** Royston, Hertfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.94664, -0.02822

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 8 | Not listed |
| CHAdeMO | 50 kW | 8 | Not listed |

- **Price:** £0.79/kWh (from Open Charge Map)

## Site information

- **Operator:** MFG EV Power
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at MFG Howe Green (MFG EV Power)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at MFG Howe Green (MFG EV Power)?

Up to 150 kW DC via CCS, CHAdeMO.

### How many charging sockets does MFG Howe Green (MFG EV Power) have?

8 charging sockets: 8 × 150 kW CCS, 8 × 50 kW CHAdeMO.

### Who operates MFG Howe Green?

MFG Howe Green is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.

### How long does a Tesla Model Y Long Range take to charge at MFG Howe Green (MFG EV Power)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Howe Green (MFG EV Power)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at MFG Howe Green (MFG EV Power)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Royston](https://ampmap.co.uk/chargers/united-kingdom/hertfordshire/royston)
- [MFG EV Power chargers](https://ampmap.co.uk/networks/mfg-ev-power)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/mfg-ev-power-mfg-howe-green-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Apr 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
