MFG EV Power · EV charging site
MFG Morrisons - St.Ives
Needingworth Road, Saint Ives, PE27 4NB
MFG Morrisons - St.Ives is an EV charging site in Saint Ives, Cambridgeshire, run by MFG EV Power. It has a single 400 kW CCS socket. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HU - St Ives (GRIDSERVE), 150 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at MFG Morrisons - St.Ives (MFG EV Power)?
Up to 400 kW DC via CCS.
How many charging sockets does MFG Morrisons - St.Ives (MFG EV Power) have?
1 charging socket: 8 × 400 kW CCS.
Who operates MFG Morrisons - St.Ives?
MFG Morrisons - St.Ives is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Morrisons - St.Ives (MFG EV Power)?
HU - St Ives (GRIDSERVE) is 150 yards away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Morrisons - St.Ives (MFG EV Power)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Morrisons - St.Ives (MFG EV Power)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Morrisons - St.Ives (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- HU - St Ives
- Meadow Lane Park and Ride Car Park
- Evology Charging - Dolphin hotel
- Shell Recharge Shell Fenstanton
- Bluntisham Service Station
- Huntingdon Garden & Home
- Cheapest nearby
- Huntingdon Garden & Home · 64p per kWh · 150 kW · 3.3 mi