MFG EV Power · EV charging site
MFG Southgate
99 Chase Side, Palmers Green, N14 5PP
MFG Southgate is a planned EV charging site in Palmers Green, Greater London, run by MFG EV Power. Its 6 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.79/kWh. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chase Side (BP Pulse), 0.2 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 12 Apr 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Getting there
- in BP branded filling station.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Southgate (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Southgate (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Southgate (MFG EV Power) have?
6 charging sockets: 8 × 150 kW CCS, 6 × 50 kW CHAdeMO.
Who operates MFG Southgate?
MFG Southgate is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Southgate (MFG EV Power)?
Chase Side (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Southgate (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Southgate (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Southgate (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chase Side
- ubitricity Distributed Energy Systems UK Ltd. 3 Cowper Road
- M&S Southgate
- ubitricity Distributed Energy Systems UK Ltd. 44 Chase Road, opp.
- Oakwood Station NCP Car Park
- hub_l001901_cs_07
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 44 Chase Road, opp. · 67p per kWh · 5 kW · 0.8 mi