MFG EV Power · EV charging site
MFG - Weston Super Mare
The Taxiway, Weston-super-Mare, BS24 8FN
MFG - Weston Super Mare is an EV charging site in Weston-super-Mare, North Somerset, run by MFG EV Power. It has a single socket, with CCS at up to 150 kW, and the price is listed as £0.79/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Landing Light, Weston-super-Mare (Osprey Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 8 Apr 2026)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG - Weston Super Mare (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG - Weston Super Mare (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG - Weston Super Mare (MFG EV Power) have?
1 charging socket: 6 × 150 kW CCS, 6 × 50 kW CHAdeMO.
Who operates MFG - Weston Super Mare?
MFG - Weston Super Mare is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG - Weston Super Mare (MFG EV Power)?
Landing Light, Weston-super-Mare (Osprey Charging) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG - Weston Super Mare (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG - Weston Super Mare (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG - Weston Super Mare (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Landing Light, Weston-super-Mare
- Tim Hortons
- Howards Toyota
- Miller and Carter Weston Gateway
- Weston-Super-Mare, Weston Retail Park
- Revive_NSC
- Cheapest nearby
- Landing Light, Weston-super-Mare · 89p per kWh · 50 kW · 0.1 mi
- Fastest nearby
- Tim Hortons · 160 kW · 1.1 mi