MFG EV Power · EV charging site
Morrisons Abergavenny MFG
Lion Street, Pontypool, NP7 5PE
Morrisons Abergavenny MFG is an EV charging site in Pontypool, Torfaen County Borough, run by MFG EV Power. It has a single 400 kW CCS socket. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Abergavenny, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Abergavenny MFG (MFG EV Power)?
Up to 400 kW DC via CCS.
How many charging sockets does Morrisons Abergavenny MFG (MFG EV Power) have?
1 charging socket: 6 × 400 kW CCS.
Who operates Morrisons Abergavenny MFG?
Morrisons Abergavenny MFG is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to Morrisons Abergavenny MFG (MFG EV Power)?
IONITY GmbH IONITY Abergavenny is 0.8 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Abergavenny MFG (MFG EV Power)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Abergavenny MFG (MFG EV Power)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Abergavenny MFG (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fairfield, Abergavenny
- Gwent Energy CIC
- Byefield Lane Car Park, Tudor Street
- Private Drive
- Pod Point Nevill Hall Hospital
- IONITY GmbH IONITY Abergavenny
- Cheapest nearby
- Pod Point Nevill Hall Hospital · 21.6p per kWh · 7 kW · 0.7 mi