MFG EV Power · EV charging site
Morrisons Blaydon-on-Tyne
Shibdon Road, Blaydon-on-Tyne, NE21 5BT
Morrisons Blaydon-on-Tyne is an EV charging site in Blaydon-on-Tyne, Gateshead, run by MFG EV Power. Both of its sockets are 50 kW CCS. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks Blaydon (InstaVolt Ltd), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Blaydon-on-Tyne (MFG EV Power)?
Up to 50 kW DC via CCS.
How many charging sockets does Morrisons Blaydon-on-Tyne (MFG EV Power) have?
2 charging sockets: 2 × 50 kW CCS.
Who operates Morrisons Blaydon-on-Tyne?
Morrisons Blaydon-on-Tyne is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to Morrisons Blaydon-on-Tyne (MFG EV Power)?
Starbucks Blaydon (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Starbucks Blaydon
- Stella House
- Derwenthaugh Road
- Henderson Environmental Services Ltd
- Sands Road Car Park
- EH - IKEA Gateshead
- Cheapest nearby
- EH - IKEA Gateshead · 59p per kWh · 30 kW · 1.2 mi
- Fastest nearby
- Sands Road Car Park · 300 kW · 1.1 mi