# Morrisons Blaydon-on-Tyne · MFG EV Power

Web page: https://ampmap.co.uk/charger/mfg-ev-power-morrisons-blaydon-on-tyne-uk

Morrisons Blaydon-on-Tyne is an EV charging site in Blaydon-on-Tyne, Gateshead, run by MFG EV Power. Both of its sockets are 50 kW CCS.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Shibdon Road, NE21 5BT
- **Area:** Blaydon-on-Tyne, Gateshead, United Kingdom
- **Coordinates (latitude, longitude):** 54.96354, -1.70954

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |

## Site information

- **Operator:** MFG EV Power
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Morrisons Blaydon-on-Tyne (MFG EV Power)?

Up to 50 kW DC via CCS.

### How many charging sockets does Morrisons Blaydon-on-Tyne (MFG EV Power) have?

2 charging sockets: 2 × 50 kW CCS.

### Who operates Morrisons Blaydon-on-Tyne?

Morrisons Blaydon-on-Tyne is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.

### How long does a Tesla Model Y Long Range take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Morrisons Blaydon-on-Tyne (MFG EV Power)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Blaydon-on-Tyne](https://ampmap.co.uk/chargers/united-kingdom/gateshead/blaydon-on-tyne)
- [MFG EV Power chargers](https://ampmap.co.uk/networks/mfg-ev-power)

## Chargers near this site

- [Starbucks Blaydon · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-starbucks-blaydon-uk) - CCS 120 kW, CHAdeMO 100 kW · Tyne Street
- [Stella House · Chargemaster](https://ampmap.co.uk/charger/chargemaster-stella-house-uk) - Type 2 7 kW · Goldcrest Way
- [Derwenthaugh Road · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-derwenthaugh-road-uk) - Type 2 7 kW · Derwenthaugh Road
- [Henderson Environmental Services Ltd](https://ampmap.co.uk/charger/henderson-environmental-services-ltd-uk) - Type 2 7 kW · Unit 4, Sands Industrial Estate
- [Sands Road Car Park · Electra](https://ampmap.co.uk/charger/electra-sands-road-car-park-uk) - CCS 300 kW · Sands Road
- [EH - IKEA Gateshead · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-ikea-gateshead-uk) - CCS 30 kW, CHAdeMO 30 kW · Scotswood view · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/mfg-ev-power-morrisons-blaydon-on-tyne-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
