MFG EV Power · EV charging site
Morrisons Brecon
Free Street, Brecon, LD3 7SE
Morrisons Brecon is an EV charging site in Brecon, Sir Powys, run by MFG EV Power. Both of its sockets are 50 kW CCS, and the price is listed as £0.68/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Beaufort Street Car Park (Evolt), 12.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.68/kWh(from Open Charge Map, 23 May 2025)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morrisons Brecon (MFG EV Power)?
The listed price is £0.68/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Morrisons Brecon (MFG EV Power)?
Up to 50 kW DC via CCS.
How many charging sockets does Morrisons Brecon (MFG EV Power) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CCS.
Who operates Morrisons Brecon?
Morrisons Brecon is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to Morrisons Brecon (MFG EV Power)?
Beaufort Street Car Park (Evolt) is 12.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Brecon (MFG EV Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Brecon (MFG EV Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Brecon (MFG EV Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Brecon - Visitor Car Park
- The Watton Car Park - Brecon
- Pod Point Brecon Beacons - Ffrwdgrech Depot
- The Barn at Brynich
- Peterstone Court Hotel
- Cheapest nearby
- Pod Point Brecon - Visitor Car Park · 45.6p per kWh · 22 kW · 0.1 mi