Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

MFG EV Power · EV charging site

Morrisons Swindon Dorcan

Eldene Drive, Swindon, SN3 3TX

Morrisons Swindon Dorcan is an EV charging site in Swindon, Borough of Swindon, run by MFG EV Power. Both of its sockets are 50 kW CCS, and the price is listed as £0.79/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Coate SF Connect (BP Pulse), 0.9 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Aug 2025Last verified 12 Aug 2025

Connectors

CCS · 50 kW2 connectors

Site information

Operator
MFG EV Power
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
£0.79/kWh(from Open Charge Map, 12 Aug 2025)
Phone (from Open Charge Map)
+44 20 8515 8559

Facilities

SupermarketMorrisons

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Morrisons Swindon Dorcan (MFG EV Power)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Morrisons Swindon Dorcan (MFG EV Power)?

Up to 50 kW DC via CCS.

How many charging sockets does Morrisons Swindon Dorcan (MFG EV Power) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CCS.

Who operates Morrisons Swindon Dorcan?

Morrisons Swindon Dorcan is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.

Where is the nearest other charger with 50 kW or more to Morrisons Swindon Dorcan (MFG EV Power)?

Coate SF Connect (BP Pulse) is 0.9 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Morrisons Swindon Dorcan (MFG EV Power)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Swindon Dorcan (MFG EV Power)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Morrisons Swindon Dorcan (MFG EV Power)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 Aug 2025

Amp Map does not take payment. You pay the operator.