Combe House · EV charging site
Combe House
Combe House Hotel & Restaurant, Bridgwater, TA5 1RZ
Combe House is an EV charging site in Bridgwater, Somerset, run by Combe House and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 100% uptime and recorded 7 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Quantock (Bridgwater) (evyve), 8.8 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Combe House
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- House Bay 1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Combe House?
Up to 7 kW AC via Type 2.
How many charging sockets does Combe House have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Combe House open 24/7?
Yes - Combe House is open 24 hours a day, 7 days a week.
When is Combe House busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Combe House?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 7 observed charging sessions.
Who operates Combe House?
Combe House is on the Combe House network.
Where is the nearest charger with 50 kW or more to Combe House?
Quantock (Bridgwater) (evyve) is 8.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Combe House?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Combe House?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Combe House?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.