# Consort Hotel

Web page: https://ampmap.co.uk/charger/monta-aps-consort-hotel-secondary-uk

Consort Hotel is an EV charging site in Maltby, Rotherham, run by Consort Hotel and open 24 hours a day. Both of its sockets are 11 kW Type 2. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 8 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 20:28 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Consort Hotel, S66 9JA
- **Area:** Maltby, Rotherham, United Kingdom
- **Coordinates (latitude, longitude):** 53.39968, -1.26463

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 11 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** Consort Hotel
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Consort Hotel?

Up to 11 kW AC via Type 2.

### How many charging sockets does Consort Hotel have?

2 charging sockets: 2 × 11 kW Type 2. Live per-socket availability is shown on this page.

### Is Consort Hotel open 24/7?

Yes - Consort Hotel is open 24 hours a day, 7 days a week.

### When is Consort Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

### How reliable is Consort Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 8 observed charging sessions.

### Who operates Consort Hotel?

Consort Hotel is on the Consort Hotel network.

### How long does a Tesla Model Y Long Range take to charge at Consort Hotel?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Consort Hotel?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Consort Hotel?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Maltby](https://ampmap.co.uk/chargers/united-kingdom/rotherham/maltby)

## Chargers near this site

- [Pod Point NHS Property Services](https://ampmap.co.uk/charger/pod-point-nhs-property-services-uk) - Type 2 7 kW · Oak House Wickersley · Free to use
- [Bannatyne's Health Club - Rotherham · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-bannatyne-s-health-club-rotherham-uk) - CCS 50 kW · Moorhead Way
- [DRAX00234 · Drax Energy Solutions Limited](https://ampmap.co.uk/charger/drax-energy-solutions-limited-drax00234-uk) - Type 2 22 kW · Moorhead Way
- [Morrison Rotherham Bramley · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrison-rotherham-bramley-uk) - Type 2 60 kW, CHAdeMO 50 kW · Bramley
- [EVC Prime Lodge Rotherham · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-prime-lodge-rotherham-uk) - Type 2 22 kW · Hellaby Industrial Estate
- [Monks Bridge Farm (Dinnington) · evyve](https://ampmap.co.uk/charger/evyve-monks-bridge-farm-dinnington-uk) - CCS 75 kW · Nobel Way · From 85p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-consort-hotel-secondary-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Consort Hotel (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
