Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Cooper Barnes · EV charging site

Cooper Barnes

The Grip Industrial Estate 2, Saffron Walden, CB21 4XN

Cooper Barnes is an EV charging site in Saffron Walden, Essex, run by Cooper Barnes and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 16 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Fourwentways, 3.1 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Cooper Barnes’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectors2 free
Charger 1100% reliabilityAvailable
Charger 2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
Charger 1
Getting there
Please ensure the correct cable is used. Cooper Barnes Automotive accept no liability for damage caused to the vehicle whilst connected to the charger or on our property.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Cooper Barnes?

Up to 22 kW AC via Type 2.

How many charging sockets does Cooper Barnes have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Cooper Barnes open 24/7?

Yes - Cooper Barnes is open 24 hours a day, 7 days a week.

When is Cooper Barnes busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Cooper Barnes?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 16 observed charging sessions.

Who operates Cooper Barnes?

Cooper Barnes is on the Cooper Barnes network.

Where is the nearest charger with 50 kW or more to Cooper Barnes?

Shell Recharge Shell Fourwentways is 3.1 miles away in a straight line, with up to 180 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cooper Barnes?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cooper Barnes?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cooper Barnes?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Cooper Barnes · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.