# Cowley Manor

Web page: https://ampmap.co.uk/charger/monta-aps-cowley-manor-bay-1-new-uk

Cowley Manor is an EV charging site in Cheltenham, Gloucestershire, run by Cowley Manor and open 24 hours a day. All 3 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 45 charging sessions here over the last 30 days.

## Status

3 of 3 open at 22 Nov 2026, 23:58 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Cowley Manor Experimental, GL53 9NL
- **Area:** Cheltenham, Gloucestershire, United Kingdom
- **Coordinates (latitude, longitude):** 51.83072, -2.05307

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 3 | Not listed | 3 free |

## Site information

- **Operator:** Cowley Manor
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Cowley Manor?

Up to 22 kW AC via Type 2.

### How many charging sockets does Cowley Manor have?

3 charging sockets: 3 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Cowley Manor open 24/7?

Yes - Cowley Manor is open 24 hours a day, 7 days a week.

### When is Cowley Manor busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

### How reliable is Cowley Manor?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 45 observed charging sessions.

### Who operates Cowley Manor?

Cowley Manor is on the Cowley Manor network.

### How long does a Tesla Model Y Long Range take to charge at Cowley Manor?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cowley Manor?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cowley Manor?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cheltenham](https://ampmap.co.uk/chargers/united-kingdom/gloucestershire/cheltenham)

## Chargers near this site

- [National Star · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-national-star-uk) - Type 2 7 kW · Ullenwood Manor Road,
- [Elkstone Studios, Elkstone · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-elkstone-farm-shop-uk) - CCS 75 kW, CHAdeMO 50 kW · Elkstone Studios · From 89p/kWh
- [Clock Tower, Cheltenham · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-the-clock-tower-uk) - CCS 50 kW, CHAdeMO 50 kW · Charlton Kings · From 89p/kWh
- [The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) · Go Zero](https://ampmap.co.uk/charger/go-zero-the-greenway-hotel-and-spa-cheltenham-eden-hotels-uk) - Type 2 22 kW · The Greenway Hotel and Spa
- [Morrisons · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-4-uk) - CHAdeMO 50 kW, Type 2 50 kW · Morrisons Caernarvon Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-cowley-manor-bay-1-new-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Cowley Manor (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
