# Easy Jet

Web page: https://ampmap.co.uk/charger/monta-aps-easy-jet-1-a-uk

Easy Jet is an EV charging site in Luton, run by Easy Jet and open 24 hours a day. All 18 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 95% uptime and recorded 58 charging sessions here over the last 30 days.

## Status

16 of 18 open at 22 Nov 2026, 17:43 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Capability Grn, LU1
- **Area:** Luton, United Kingdom
- **Coordinates (latitude, longitude):** 51.86516, -0.40785

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 18 | Not listed | 16 free, 2 out of service |

## Site information

- **Operator:** Easy Jet
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Easy Jet?

Up to 7 kW AC via Type 2.

### How many charging sockets does Easy Jet have?

18 charging sockets: 18 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Easy Jet open 24/7?

Yes - Easy Jet is open 24 hours a day, 7 days a week.

### When is Easy Jet busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is Easy Jet?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 58 observed charging sessions.

### Who operates Easy Jet?

Easy Jet is on the Easy Jet network.

### How long does a Tesla Model Y Long Range take to charge at Easy Jet?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Easy Jet?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Easy Jet?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Luton](https://ampmap.co.uk/chargers/united-kingdom/luton/luton)
- [Cheapest charging in Luton](https://ampmap.co.uk/chargers/united-kingdom/luton/luton/cheapest)

## Chargers near this site

- [500 Capability Green · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-500-capability-green-uk) - Type 2 7 kW · 500 Capability Green
- [The Arc, Clowne · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-the-arc-clowne-uk) - CCS / CHAdeMO / Type 2 50 kW, CCS / Type 2 50 kW · The Arc, Clowne · From 89p/kWh
- [Braintree Enterprise Centre · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-braintree-enterprise-centre-uk) - Type 2 22 kW · Braintree Enterprise Centre, Enterprise Drive · From 65p/kWh
- [Stockwood Park Discovery Centre · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-stockwood-park-discovery-centre-2-uk) - Type 2 7 kW · Stockwood Park Discovery Centre, London Road · From 65p/kWh
- [Luton, UK · Tesla](https://ampmap.co.uk/charger/tesla-luton-gipsy-lane-retail-park-uk) - CCS 250 kW · Gipsy Lane · From 37p/kWh
- [Pod Point Luton Airport Parkway Railway Station](https://ampmap.co.uk/charger/pod-point-luton-airport-parkway-station-uk) - Type 2 22 kW, Type 2 7 kW · Parkway Road · From 60p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-easy-jet-1-a-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Easy Jet (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
