# Hungerford Farm

Web page: https://ampmap.co.uk/charger/monta-aps-hungerford-farm-uk

Hungerford Farm is an EV charging site in Jeffreyston, Pembrokeshire, run by Hungerford Farm and open 24 hours a day. It has a single 4 kW Type 2 socket. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 21:05 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Hungerford CP SA68 0NY
- **Area:** Jeffreyston, Pembrokeshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.75470, -4.79509
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 4 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Hungerford Farm
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Hungerford Farm?

Up to 4 kW AC via Type 2.

### How many charging sockets does Hungerford Farm have?

1 charging socket: 1 × 4 kW Type 2. Live per-socket availability is shown on this page.

### Is Hungerford Farm open 24/7?

Yes - Hungerford Farm is open 24 hours a day, 7 days a week.

### When is Hungerford Farm busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around noon. The live status on this page shows what is free before you set off.

### How reliable is Hungerford Farm?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.

### Who operates Hungerford Farm?

Hungerford Farm is on the Hungerford Farm network.

### How long does a Tesla Model Y Long Range take to charge at Hungerford Farm?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hungerford Farm?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hungerford Farm?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Jeffreyston](https://ampmap.co.uk/chargers/united-kingdom/pembrokeshire/jeffreyston)

## Chargers near this site

- [Joshua Banfield](https://ampmap.co.uk/charger/joshua-banfield-uk) - Type 2 7 kW · hillcrest
- [Pod Point Bluestone Resorts Ltd - Merlin's Crest](https://ampmap.co.uk/charger/pod-point-bluestone-resorts-ltd-merlin-s-crest-2-uk) - Type 2 7 kW · The Grange, Canaston Wood Pembrokeshire · From 45.6p/kWh
- [Pod Point Bluestone Resorts Ltd](https://ampmap.co.uk/charger/pod-point-bluestone-resorts-ltd-2-uk) - Type 2 7 kW · Bluestone, The Grange Canaston Wood, Narberth · From 45.6p/kWh
- [Pod Point Folly Farm Leisure Ltd](https://ampmap.co.uk/charger/pod-point-folly-farm-leisure-ltd-uk) - Type 2 7 kW · Folly Farm Leisure Ltd · From 60p/kWh
- [Pod Point Apple Camping Ltd](https://ampmap.co.uk/charger/pod-point-apple-camping-ltd-uk) - Type 2 7 kW · Norchard Farmhouse · From 25.2p/kWh
- [Town Moor Car Park · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-town-moor-car-park-uk) - Type 2 22 kW · Town Moor

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-hungerford-farm-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Hungerford Farm (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
