# Kellys group

Web page: https://ampmap.co.uk/charger/monta-aps-kellys-group-a-uk

Kellys group is an EV charging site in Newry, Newry Mourne and Down, run by Kellys group and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 33 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 16:31 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Milltown East Industrial Estate, BT34 3PN
- **Area:** Newry, Newry Mourne and Down, United Kingdom
- **Coordinates (latitude, longitude):** 54.11829, -6.26516

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** Kellys group
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Kellys group?

Up to 22 kW AC via Type 2.

### How many charging sockets does Kellys group have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Kellys group open 24/7?

Yes - Kellys group is open 24 hours a day, 7 days a week.

### When is Kellys group busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Kellys group?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 33 observed charging sessions.

### Who operates Kellys group?

Kellys group is on the Kellys group network.

### How long does a Tesla Model Y Long Range take to charge at Kellys group?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kellys group?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Kellys group?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newry](https://ampmap.co.uk/chargers/united-kingdom/newry-mourne-and-down/newry)

## Chargers near this site

- [DAERA Portal Control](https://ampmap.co.uk/charger/daera-portal-control-uk) - Type 2 7 kW · 58 Newry Rd
- [Havelock Place, Warrenpoint · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-havelock-place-warrenpoint-uk) - Type 2 22 kW · Havelock Place

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-kellys-group-a-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Kellys group (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
