# La Fleur de Lys Inn

Web page: https://ampmap.co.uk/charger/monta-aps-la-fleur-de-lys-inn-uk

La Fleur de Lys Inn is an EV charging site in Shaftesbury, Dorset, run by La Fleur de Lys Inn and open 24 hours a day. It has a single 7 kW Type 2 socket. Amp Map measured 100% uptime here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 21:27 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Bleke St, SP7 8AW
- **Area:** Shaftesbury, Dorset, United Kingdom
- **Coordinates (latitude, longitude):** 51.00857, -2.19637
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** La Fleur de Lys Inn
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at La Fleur de Lys Inn?

Up to 7 kW AC via Type 2.

### How many charging sockets does La Fleur de Lys Inn have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is La Fleur de Lys Inn open 24/7?

Yes - La Fleur de Lys Inn is open 24 hours a day, 7 days a week.

### How reliable is La Fleur de Lys Inn?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

### Who operates La Fleur de Lys Inn?

La Fleur de Lys Inn is on the La Fleur de Lys Inn network.

### How long does a Tesla Model Y Long Range take to charge at La Fleur de Lys Inn?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at La Fleur de Lys Inn?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at La Fleur de Lys Inn?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Shaftesbury](https://ampmap.co.uk/chargers/united-kingdom/dorset/shaftesbury)

## Chargers near this site

- [Bell Street Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-bell-street-car-park-uk) - CCS 150 kW, CCS 50 kW · Bell Street Car Park · From 59p/kWh
- [Pod Point Tesco Superstore - Shaftesbury](https://ampmap.co.uk/charger/pod-point-tesco-superstore-shaftesbury-uk) - Type 2 7 kW · Christy's Lane · From 44.4p/kWh
- [Lidl Shafesbury](https://ampmap.co.uk/charger/lidl-shafesbury-uk) - CCS 50 kW, CHAdeMO 50 kW · Christy's Lane
- [InstaVolt Chaldicott Farm · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-chaldicott-farm-uk) - CCS 120 kW, CHAdeMO 50 kW · Chaldicott Farm
- [Merck B2 EV Pts Station 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-merck-b2-ev-pts-station-1-uk) - Type 2 22 kW · New Road
- [Merck B2 EV Pts Station 4 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-merck-b2-ev-pts-station-4-uk) - Type 2 22 kW · New Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-la-fleur-de-lys-inn-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: La Fleur de Lys Inn (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
