Machynys GC · EV charging site
Machynys GC
Machynys GC, Llanelli, SA15 2DG
Machynys GC is an EV charging site in Llanelli, Carmarthenshire, run by Machynys GC and open 24 hours a day. Its 6 sockets reach up to 40 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 22 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lidl-Machynys Link Road, 0.4 miles away.
Status
4 of 6 available
Checking status…
Connectors
CCS · 40 kW
Type 2 · 5 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Machynys GC
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- Bank card at the chargerIn the operator's appRFID card
- Charger ID
- Machynys DC A
- Bays
- Must stay plugged in while parked
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Machynys GC?
Up to 40 kW DC via Type 2, CCS.
How many charging sockets does Machynys GC have?
6 charging sockets: 4 × 5 kW Type 2, 2 × 40 kW CCS. Live per-socket availability is shown on this page.
Is Machynys GC open 24/7?
Yes - Machynys GC is open 24 hours a day, 7 days a week.
When is Machynys GC busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is Machynys GC?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 22 observed charging sessions.
Who operates Machynys GC?
Machynys GC is on the Machynys GC network.
Where is the nearest charger with 50 kW or more to Machynys GC?
Lidl-Machynys Link Road is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Machynys GC?
A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Machynys GC?
A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Machynys GC?
A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lidl-Machynys Link Road
- Pentre Awel
- Parc Trostre Retail Park
- Pod Point Tesco Extra - Llanelli
- Sessile Oak, Llanelli
- Murray Street Multi-Storey Car Park
- Cheapest nearby
- Pod Point Tesco Extra - Llanelli · 44.4p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Pentre Awel · 180 kW · 0.5 mi