Quakers · EV charging site
Quakers
21 Thorpe Rd, Peterborough, PE3 6AB
Quakers is an EV charging site in Peterborough, run by Quakers and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime here over the last 30 days. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Boathouse (Peterborough) (evyve), 0.6 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Quakers
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the operator's appRFID card
- Charger ID
- Quakers (L)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Quakers?
Up to 7 kW AC via Type 2.
How many charging sockets does Quakers have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Quakers open 24/7?
Yes - Quakers is open 24 hours a day, 7 days a week.
When is Quakers busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 2 pm. The live status on this page shows what is free before you set off.
How reliable is Quakers?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Quakers?
Quakers is on the Quakers network.
Where is the nearest charger with 50 kW or more to Quakers?
Boathouse (Peterborough) (evyve) is 0.6 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Quakers?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quakers?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Quakers?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Queensgate Green Car Park
- Pod Point Park Road
- Pod Point St Peters Road
- Pod Point Car Haven Car Park
- Pod Point Premier Inn - Peterborough City Centre
- Pod Point City Road
- Cheapest nearby
- Pod Point Premier Inn - Peterborough City Centre · 44.4p per kWh · 7 kW · 0.5 mi