# Rose and Crown, Romaldkirk

Web page: https://ampmap.co.uk/charger/monta-aps-rose-and-crown-1-uk

Rose and Crown, Romaldkirk is an EV charging site in Romaldkirk, County Durham, run by Rose and Crown, Romaldkirk and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 100% uptime and recorded 6 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 19:51 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** The Rose & Crown at Romaldkirk, DL12 9EB
- **Area:** Romaldkirk, County Durham, United Kingdom
- **Coordinates (latitude, longitude):** 54.59390, -2.00979

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Rose and Crown, Romaldkirk
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Rose and Crown, Romaldkirk?

Up to 7 kW AC via Type 2.

### How many charging sockets does Rose and Crown, Romaldkirk have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Rose and Crown, Romaldkirk open 24/7?

Yes - Rose and Crown, Romaldkirk is open 24 hours a day, 7 days a week.

### When is Rose and Crown, Romaldkirk busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

### How reliable is Rose and Crown, Romaldkirk?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 6 observed charging sessions.

### Who operates Rose and Crown, Romaldkirk?

Rose and Crown, Romaldkirk is on the Rose and Crown, Romaldkirk network.

### How long does a Tesla Model Y Long Range take to charge at Rose and Crown, Romaldkirk?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rose and Crown, Romaldkirk?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rose and Crown, Romaldkirk?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Romaldkirk](https://ampmap.co.uk/chargers/united-kingdom/county-durham/romaldkirk)

## Chargers near this site

- [Mickleton Services · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-mickleton-services-uk) - Type 2 7 kW · Mickleton Services
- [Mickleton Services · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-mickleton-services-2-uk) - Type 2 · Mickleton Services

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-rose-and-crown-1-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Rose and Crown, Romaldkirk (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
