# Woodland Manor Hotel & Restaurant

Web page: https://ampmap.co.uk/charger/monta-aps-woodland-manor-hotel-charger-2-uk

Woodland Manor Hotel & Restaurant is an EV charging site in Bedford, run by Woodland Manor Hotel & Restaurant and open 24 hours a day. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 33 charging sessions here over the last 30 days.

## Status

2 of 2 open at 23 Nov 2026, 01:26 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Green Ln, MK41 6EP
- **Area:** Bedford, United Kingdom
- **Coordinates (latitude, longitude):** 52.16034, -0.48713
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed | 1 free |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Woodland Manor Hotel & Restaurant
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Woodland Manor Hotel & Restaurant?

Up to 22 kW AC via Type 2.

### How many charging sockets does Woodland Manor Hotel & Restaurant have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Woodland Manor Hotel & Restaurant open 24/7?

Yes - Woodland Manor Hotel & Restaurant is open 24 hours a day, 7 days a week.

### When is Woodland Manor Hotel & Restaurant busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around noon. The live status on this page shows what is free before you set off.

### How reliable is Woodland Manor Hotel & Restaurant?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 33 observed charging sessions.

### Who operates Woodland Manor Hotel & Restaurant?

Woodland Manor Hotel & Restaurant is on the Woodland Manor Hotel & Restaurant network.

### How long does a Tesla Model Y Long Range take to charge at Woodland Manor Hotel & Restaurant?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodland Manor Hotel & Restaurant?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Woodland Manor Hotel & Restaurant?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bedford](https://ampmap.co.uk/chargers/united-kingdom/bedford/bedford)
- [Cheapest charging in Bedford](https://ampmap.co.uk/chargers/united-kingdom/bedford/bedford/cheapest)

## Chargers near this site

- [Pod Point BrewPoint](https://ampmap.co.uk/charger/pod-point-brewpoint-uk) - Type 2 7 kW · Cut Throat Lane · From 45.6p/kWh
- [Brewpoint Taproom & Brewery, Bedford · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-brewpoint-uk) - CCS 300 kW, CCS 281 kW · Cut Throat Lane · From 89p/kWh
- [McDonalds · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonalds-2-uk) - CCS 150 kW · Fairhill
- [Park Road West](https://ampmap.co.uk/charger/park-road-west-uk) - Type 2 7 kW
- [Cutcliffe Grove 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-cutcliffe-grove-1-uk) - Type 2 7 kW · Cutcliffe Grove
- [D'Parys, Bedford · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-d-parys-uk) - CCS 75 kW, CHAdeMO 50 kW · 45 De Parys Avenue · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-aps-woodland-manor-hotel-charger-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Woodland Manor Hotel & Restaurant (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
