Monta · EV charging site
Bayview Hotel
2 Bayhead Road, Coleraine, BT57 8RZ
Bayview Hotel is an EV charging site in Coleraine, Causeway Coast and Glens, run by Monta. All 3 of its sockets are 22 kW NACS and Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Portrush Service Station (ESB Ecars), 4.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Monta
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- +44 2820 734 100
- Notes
- Available for patrons only. Please call ahead.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bayview Hotel (Monta)?
Up to 22 kW AC via NACS, Type 2.
How many charging sockets does Bayview Hotel (Monta) have?
3 charging sockets: 2 × 22 kW NACS, 3 × 22 kW Type 2.
Who operates Bayview Hotel?
Bayview Hotel is on the Monta network. For site issues, the operator lists +44 2820 734 100.
Can anyone charge at Bayview Hotel (Monta)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Bayview Hotel (Monta)?
Portrush Service Station (ESB Ecars) is 4.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bayview Hotel (Monta)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bayview Hotel (Monta)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bayview Hotel (Monta)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.