Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Monta · EV charging site

Claire's Coffee

Forkhill Rd, Newry, BT35 8QX

Claire's Coffee is an EV charging site in Newry, Newry Mourne and Down, run by Monta. It has a single 24 kW CCS socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Hill Street (ESB Ecars), 2.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Oct 2024Last verified 18 Oct 2024

Connectors

CCS · 24 kW1 connector

Site information

Operator
Monta
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 24 kW CCS~2h 26m
Tesla Model 3 Rear-Wheel Drive 10–80% · 24 kW CCS~1h 45m
Audi Q4 e-tron 50 10–80% · 24 kW CCS~2h 14m
Hyundai IONIQ 5 10–80% · 24 kW CCS~2h 14m
MG Motor MG4 Trophy 10–80% · 24 kW CCS~1h 52m
Hyundai Kona Electric Long Range 10–80% · 24 kW CCS~1h 47m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Claire's Coffee (Monta)?

Up to 24 kW DC via CCS.

How many charging sockets does Claire's Coffee (Monta) have?

1 charging socket: 1 × 24 kW CCS.

Who operates Claire's Coffee?

Claire's Coffee is on the Monta network.

Where is the nearest charger with 50 kW or more to Claire's Coffee (Monta)?

Hill Street (ESB Ecars) is 2.2 miles away in a straight line, with up to 100 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Claire's Coffee (Monta)?

A typical 10–80% rapid charge takes about 2h 26m on the 24 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Claire's Coffee (Monta)?

A typical 10–80% rapid charge takes about 1h 45m on the 24 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Claire's Coffee (Monta)?

A typical 10–80% rapid charge takes about 2h 14m on the 24 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Oct 2024

Amp Map does not take payment. You pay the operator.