Monta · EV charging site
Green Turtle Energy Stirling Court
Stirling Way, Borehamwood, WD6 2FX
Green Turtle Energy Stirling Court is an EV charging site in Borehamwood, Hertfordshire, run by Monta. Both of its sockets are 180 kW CCS, and the price is listed as £0.59/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Stirling Corner, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Monta
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.59/kWh(from Open Charge Map, 9 May 2025)
- Phone (from Open Charge Map)
- 02089591557
- Notes
- You can pay by card, or monta app, or third party app, or qr
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Green Turtle Energy Stirling Court (Monta)?
The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Green Turtle Energy Stirling Court (Monta)?
Up to 180 kW DC via CCS.
How many charging sockets does Green Turtle Energy Stirling Court (Monta) have?
2 charging sockets: 2 × 180 kW CCS.
Who operates Green Turtle Energy Stirling Court?
Green Turtle Energy Stirling Court is on the Monta network. For site issues, the operator lists 02089591557.
Where is the nearest other charger with 50 kW or more to Green Turtle Energy Stirling Court (Monta)?
Shell Recharge Shell Stirling Corner is 0.3 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Green Turtle Energy Stirling Court (Monta)?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Green Turtle Energy Stirling Court (Monta)?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Green Turtle Energy Stirling Court (Monta)?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Atlantic House
- Morrisons
- Shell Recharge Shell Stirling Corner
- Clarendon SF Connect
- Lidl-Borehamwood
- Shell Recharge Shell Elstree Way
- Cheapest nearby
- Shell Recharge Shell Stirling Corner · 79p per kWh · 175 kW · 0.3 mi