Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Monta · EV charging site

Leestone Caravan Park

Leestone Rd, Kilkeel, BT34 4NW

Leestone Caravan Park is an EV charging site in Kilkeel, Newry Mourne and Down, run by Monta. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is EUROSPAR Newcastle Road (BP Pulse), 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Oct 2024Last verified 18 Oct 2024

Connectors

Type 2 · 22 kW1 connector
Type 2 · 7 kW1 connector

Site information

Operator
Monta
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Leestone Caravan Park (Monta)?

Up to 22 kW AC via Type 2.

How many charging sockets does Leestone Caravan Park (Monta) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 22 kW Type 2.

Who operates Leestone Caravan Park?

Leestone Caravan Park is on the Monta network.

Where is the nearest charger with 50 kW or more to Leestone Caravan Park (Monta)?

EUROSPAR Newcastle Road (BP Pulse) is 1 mile away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Leestone Caravan Park (Monta)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Leestone Caravan Park (Monta)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Leestone Caravan Park (Monta)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Oct 2024

Amp Map does not take payment. You pay the operator.