Monta · EV charging site
Public EV Charger @ The Vale
Unit 2 Vale Mill, Stalybridge, OL59JL
Public EV Charger @ The Vale is an EV charging site in Stalybridge, Borough of Tameside, run by Monta. Both of its sockets are 22 kW CCS, and the price is listed as 0.55 per kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Kingfisher, Oldham (Osprey Charging), 1.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Monta
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- 0.55 per kWh(from Open Charge Map, 1 Mar 2026)
- Phone (from Open Charge Map)
- 01457238089
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Public EV Charger @ The Vale (Monta)?
The listed price is 0.55 per kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Public EV Charger @ The Vale (Monta)?
Up to 22 kW AC via CCS.
How many charging sockets does Public EV Charger @ The Vale (Monta) have?
2 charging sockets: 2 × 22 kW CCS.
Who operates Public EV Charger @ The Vale?
Public EV Charger @ The Vale is on the Monta network. For site issues, the operator lists 01457238089.
Where is the nearest charger with 50 kW or more to Public EV Charger @ The Vale (Monta)?
Kingfisher, Oldham (Osprey Charging) is 1.7 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Public EV Charger @ The Vale (Monta)?
A 10–80% charge takes about 5h 2m on the 22 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Public EV Charger @ The Vale (Monta)?
A 10–80% charge takes about 3h 38m on the 22 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Public EV Charger @ The Vale (Monta)?
A 10–80% charge takes about 4h 39m on the 22 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Global Grooves
- Kingfisher, Oldham
- Pod Point Tesco Superstore - Greenfield
- Darnton Road Car Park
- St John Street/Elliott Street Car park
- EG Group Stayley Bridge
- Cheapest nearby
- Pod Point Tesco Superstore - Greenfield · 44.4p per kWh · 7 kW · 1.8 mi
- Fastest nearby
- EG Group Stayley Bridge · 150 kW · 2.5 mi