# Trenderway Farm B&B and Wedding Venue · Monta

Web page: https://ampmap.co.uk/charger/monta-trenderway-farm-b-and-b-and-wedding-venue-uk

Trenderway Farm B&B and Wedding Venue is an EV charging site in St Austell, Cornwall, run by Monta. All 4 of its sockets are 22 kW NACS and CCS, and the price is listed as Subject to charge.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Trenderway Farm, PL13 2LY
- **Area:** St Austell, Cornwall, United Kingdom
- **Coordinates (latitude, longitude):** 50.35235, -4.51244

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 22 kW | 4 | Not listed |
| NACS | 22 kW | 2 | Not listed |

- **Price:** Subject to charge (from Open Charge Map)

## Site information

- **Operator:** Monta
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** https://map.monta.com/lat=50.352347&lng=-4.512234&zoom=15&cpSiteId=310452&

## Common questions

### How much does it cost to charge at Trenderway Farm B&B and Wedding Venue (Monta)?

The listed price is Subject to charge. Prices can change, so check the price at the charger before you start.

### How fast is charging at Trenderway Farm B&B and Wedding Venue (Monta)?

Up to 22 kW AC via NACS, CCS.

### How many charging sockets does Trenderway Farm B&B and Wedding Venue (Monta) have?

4 charging sockets: 2 × 22 kW NACS, 4 × 22 kW CCS.

### Who operates Trenderway Farm B&B and Wedding Venue?

Trenderway Farm B&B and Wedding Venue is on the Monta network. For site issues, the operator lists +44 150 327 2214.

### How long does a Tesla Model Y Long Range take to charge at Trenderway Farm B&B and Wedding Venue (Monta)?

A 10–80% charge takes about 5h 2m on the 22 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trenderway Farm B&B and Wedding Venue (Monta)?

A 10–80% charge takes about 3h 38m on the 22 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Trenderway Farm B&B and Wedding Venue (Monta)?

A 10–80% charge takes about 4h 39m on the 22 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in St Austell](https://ampmap.co.uk/chargers/united-kingdom/cornwall/st-austell)
- [Monta chargers](https://ampmap.co.uk/networks/monta)

## Chargers near this site

- [Trenderway Farm](https://ampmap.co.uk/charger/trenderway-farm-uk) - Type 2 22 kW · Trender Way Farm
- [Pod Point Seaview Holiday Village](https://ampmap.co.uk/charger/pod-point-seaview-holiday-village-uk) - Type 2 7 kW · Polperro Looe · From 48p/kWh
- [zest-type-post-user · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-type-post-user-uk) - Type 2 7 kW · Porthallow
- [Tourist Information Centre West Looe · POGO](https://ampmap.co.uk/charger/pogo-tourist-information-centre-west-looe-uk) - CCS 50 kW, CHAdeMO 50 kW · Millpool · From 56p/kWh
- [Cornwall Council West Looe · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-cornwall-council-west-looe-uk) - CCS 50 kW, CHAdeMO 50 kW · Millpool
- [Millpool · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-millpool-uk) - Unknown 3 kW · Millpool

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/monta-trenderway-farm-b-and-b-and-wedding-venue-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Aug 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
