# Moore Place Hotel

Web page: https://ampmap.co.uk/charger/moore-place-hotel-uk

Moore Place Hotel is an EV charging site in Bletchley, Milton Keynes, run by Moore Place Hotel and open 24 hours a day. All 4 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 10 pm, and Amp Map measured 100% uptime and recorded 31 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 15:08 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** The Square, MK17 8DW
- **Area:** Bletchley, Milton Keynes, United Kingdom
- **Coordinates (latitude, longitude):** 52.01340, -0.62829

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed | 4 free |

## Site information

- **Operator:** Moore Place Hotel
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Moore Place Hotel?

Up to 22 kW AC via Type 2.

### How many charging sockets does Moore Place Hotel have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Moore Place Hotel open 24/7?

Yes - Moore Place Hotel is open 24 hours a day, 7 days a week.

### When is Moore Place Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

### How reliable is Moore Place Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.

### Who operates Moore Place Hotel?

Moore Place Hotel is on the Moore Place Hotel network.

### How long does a Tesla Model Y Long Range take to charge at Moore Place Hotel?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Moore Place Hotel?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Moore Place Hotel?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bletchley](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/bletchley)
- [Cheapest charging in Bletchley](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/bletchley/cheapest)

## Chargers near this site

- [Russel Street Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-russel-street-car-park-uk) - Type 2 7 kW · Russel Street Car Park, Vicarage Street, Wobu · From 65p/kWh
- [Pod Point F 1](https://ampmap.co.uk/charger/pod-point-f-1-2-uk) - Type 2 7 kW · Badgers Rise · Free to use
- [Browns Wood playing fields car park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-browns-wood-playing-fields-car-park-uk) - CCS 50 kW, Type 2 7 kW · Browns Wood playing fields car park, Browns W · From 65p/kWh
- [KFC Milton Keynes East - Towergate · Roam Charging](https://ampmap.co.uk/charger/roam-charging-kfc-milton-keynes-east-towergate-uk) - CCS 140 kW · Towergate Roundabout
- [Wavendon Gate SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-wavendon-gate-sf-connect-uk) - CCS 150 kW · Newport Road
- [Blackberry Court · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-blackberry-court-walnut-tree-uk) - CCS 50 kW, CHAdeMO 50 kW · Blackberry Court, Walnut Tree · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/moore-place-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Moore Place Hotel (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.