# MOT4400102 · Moto Hospitality

Web page: https://ampmap.co.uk/charger/moto-hospitality-mot4400102-uk

MOT4400102 is an EV charging site in Dunstable, Central Bedfordshire, run by Moto Hospitality and open 24 hours a day. It has a single 400 kW CCS socket, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 147 charging sessions here over the last 30 days.

## Status

1 of 1 open at 23 Nov 2026, 00:22 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M1 northbound between Junction 11 and 12, LU5 6HR
- **Area:** Dunstable, Central Bedfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.94686, -0.50274
- **Parking:** Motorway services
- **Bays:** EV-only bays · Must stay plugged in while parked

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 400 kW | 1 | £0.89/kWh | 1 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Moto Hospitality
- **Opening hours:** Open 24 hours
- **Payment:** RFID card
- **Owner:** Moto CHARGE

## Common questions

### How much does it cost to charge at MOT4400102 (Moto Hospitality)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at MOT4400102 (Moto Hospitality)?

Up to 400 kW DC via CCS.

### How many charging sockets does MOT4400102 (Moto Hospitality) have?

1 charging socket: 1 × 400 kW CCS. Live per-socket availability is shown on this page.

### Is MOT4400102 (Moto Hospitality) open 24/7?

Yes - MOT4400102 (Moto Hospitality) is open 24 hours a day, 7 days a week.

### When is MOT4400102 (Moto Hospitality) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is MOT4400102 (Moto Hospitality)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 147 observed charging sessions.

### Who operates MOT4400102?

MOT4400102 is on the Moto Hospitality network.

### How long does a Tesla Model Y Long Range take to charge at MOT4400102 (Moto Hospitality)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MOT4400102 (Moto Hospitality)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at MOT4400102 (Moto Hospitality)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dunstable](https://ampmap.co.uk/chargers/united-kingdom/central-bedfordshire/dunstable)
- [Cheapest charging in Dunstable](https://ampmap.co.uk/chargers/united-kingdom/central-bedfordshire/dunstable/cheapest)
- [Moto Hospitality chargers](https://ampmap.co.uk/networks/moto-hospitality)

## Chargers near this site

- [MOT4400103 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400103-uk) - CCS 400 kW · M1 northbound between Junction 11 and 12 · From 89p/kWh
- [MOT4400106 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400106-uk) - CCS 400 kW · M1 northbound between Junction 11 and 12 · From 89p/kWh
- [MOT4400101 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400101-uk) - CCS 400 kW · M1 northbound between Junction 11 and 12 · From 89p/kWh
- [MOT4400104 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400104-uk) - CCS 400 kW · M1 northbound between Junction 11 and 12 · From 89p/kWh
- [MOT4400105 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400105-uk) - CCS 400 kW · M1 northbound between Junction 11 and 12 · From 89p/kWh
- [EH - MOTO Toddington Northbound · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-moto-toddington-northbound-services-uk) - CCS 360 kW, CCS 60 kW · M1 northbound J11 - J12 · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/moto-hospitality-mot4400102-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Moto Hospitality (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
