Moto Hospitality · EV charging site
MOT4400403
30 Sandygate Roundabout, Heavitree, EX2 7HF
MOT4400403 is an EV charging site at 30 Sandygate Roundabout in Heavitree, Devon, run by Moto Hospitality and open 24 hours a day. It has a single 400 kW CCS socket, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 84 charging sessions here over the last 30 days. 30 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MOT4400419 (Moto Hospitality), 10 yards away.
Status
1 of 1 available
Checking status…
Connectors
CCS · 400 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Moto Hospitality
- Opening hours
- Open 24 hours
- Parking
- Motorway services
- Payment
- RFID card
- Charger ID
- MOT4400403
- Bays
- EV-only bays · Must stay plugged in while parked
- Owner
- Moto CHARGE
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MOT4400403 (Moto Hospitality)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MOT4400403 (Moto Hospitality)?
Up to 400 kW DC via CCS.
How many charging sockets does MOT4400403 (Moto Hospitality) have?
1 charging socket: 1 × 400 kW CCS. Live per-socket availability is shown on this page.
Is MOT4400403 (Moto Hospitality) open 24/7?
Yes - MOT4400403 (Moto Hospitality) is open 24 hours a day, 7 days a week.
When is MOT4400403 (Moto Hospitality) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is MOT4400403 (Moto Hospitality)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 84 observed charging sessions.
Who operates MOT4400403?
MOT4400403 is on the Moto Hospitality network.
Where is the nearest other charger with 50 kW or more to MOT4400403 (Moto Hospitality)?
MOT4400419 (Moto Hospitality) is 10 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MOT4400403 (Moto Hospitality)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MOT4400403 (Moto Hospitality)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MOT4400403 (Moto Hospitality)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.