EV charging site
Moy Park
Seagoe Road, Portadown, BT63 5QE
Moy Park is an EV charging site in Portadown, Armagh City Banbridge and Craigavon. Both of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Tim Hortons Portadown (E.ON Drive), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Moy Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Moy Park have?
2 charging sockets: 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to Moy Park?
Tim Hortons Portadown (E.ON Drive) is 1.5 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Moy Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Moy Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Moy Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Craigavon Area Hospital
- Craigavon Area Hospital
- Craigavon Area Hospital
- Charlestown new Road
- TrustFord Craigavon
- Pod Point Tesco Extra - Craigavon
- Cheapest nearby
- Pod Point Tesco Extra - Craigavon · 44.4p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Craigavon Area Hospital · 22 kW · 0.8 mi