# National Self-Build and Renovation Centre

Web page: https://ampmap.co.uk/charger/national-self-build-and-renovation-centre-uk

National Self-Build and Renovation Centre is an EV charging site in Swindon, Borough of Swindon. All 6 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Lydiard Fields, SN5 8UB
- **Area:** Swindon, Borough of Swindon, United Kingdom
- **Coordinates (latitude, longitude):** 51.54838, -1.85400

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Opening hours:** Not published
- **Access:** Private · notice required
- **Notes:** Ask in reception

## Common questions

### How much does it cost to charge at National Self-Build and Renovation Centre?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at National Self-Build and Renovation Centre?

Up to 7 kW AC via Type 2.

### How many charging sockets does National Self-Build and Renovation Centre have?

6 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2.

### Can anyone charge at National Self-Build and Renovation Centre?

The operator lists this charger as private - access is restricted.

### How long does a Tesla Model Y Long Range take to charge at National Self-Build and Renovation Centre?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Self-Build and Renovation Centre?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at National Self-Build and Renovation Centre?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon)
- [Cheapest charging in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon/cheapest)

## Chargers near this site

- [Instavolt Lydiard Fields · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-lydiard-fields-uk) - CCS 160 kW, CHAdeMO 60 kW · Lydiard Fields
- [Charging Station npower · RWE / Npower](https://ampmap.co.uk/charger/rwe-npower-charging-station-npower-uk) - Type 2 22 kW · Windmill Hill Business Park
- [Ids Swindon · Vend Electric](https://ampmap.co.uk/charger/vend-electric-ids-swindon-uk) - Type 2 7 kW · Unit 9 Euro Way
- [Porsche Centre Swindon · Porsche Smart Mobility GmbH](https://ampmap.co.uk/charger/porsche-smart-mobility-gmbh-porsche-centre-swindon-uk) - CCS 350 kW · Frankland Road
- [Greene King Churchill House · ChargePoint](https://ampmap.co.uk/charger/chargepoint-greene-king-churchill-house-uk) - Type 2 22 kW · Swindon Road
- [IONITY GmbH IONITY Swindon VH](https://ampmap.co.uk/charger/ionity-gmbh-ionity-swindon-vh-uk) - CCS 200 kW, CCS 50 kW · Shaw Ridge Leisure Park, Whitehill Way · From 62.3p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/national-self-build-and-renovation-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 13 May 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
