# NCP Estate

Web page: https://ampmap.co.uk/charger/ncp-estate-7-uk

NCP Estate is an EV charging site in Sheffield, run by NCP Estate and open 24 hours a day. All 4 of its sockets are 11 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 77 charging sessions here over the last 30 days.

## Status

2 of 4 open at 22 Nov 2026, 15:08 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Wellington St, S1 4HF
- **Area:** Sheffield, United Kingdom
- **Coordinates (latitude, longitude):** 53.37856, -1.47404

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 11 kW | 4 | Not listed | 2 free, 2 in use |

## Site information

- **Operator:** NCP Estate
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at NCP Estate?

Up to 11 kW AC via Type 2.

### How many charging sockets does NCP Estate have?

4 charging sockets: 4 × 11 kW Type 2. Live per-socket availability is shown on this page.

### Is NCP Estate open 24/7?

Yes - NCP Estate is open 24 hours a day, 7 days a week.

### When is NCP Estate busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 7 am. The live status on this page shows what is free before you set off.

### How reliable is NCP Estate?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 77 observed charging sessions.

### Who operates NCP Estate?

NCP Estate is on the NCP Estate network.

### How long does a Tesla Model Y Long Range take to charge at NCP Estate?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NCP Estate?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at NCP Estate?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Sheffield](https://ampmap.co.uk/chargers/united-kingdom/sheffield/sheffield)
- [NCP Estate chargers](https://ampmap.co.uk/networks/ncp-estate)

## Chargers near this site

- [Carver Lane Car Park · RWE / Npower](https://ampmap.co.uk/charger/rwe-npower-carver-lane-car-park-uk) - Type 2 22 kW · Carver Lane
- [Q-Park Leeds Rockingham Street · Recharge (Formerly Fortum Charge & Drive)](https://ampmap.co.uk/charger/recharge-q-park-leeds-rockingham-street-uk) - Type 2 22 kW · Rockingham Street
- [Fitzwilliam Street Car Park, Sheffield 8 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-fitzwilliam-street-car-park-sheffield-8-uk) - Type 2 22 kW · Fitzwilliam Street, Sheffield City Centre
- [Fitzwilliam Street Car Park, Sheffield 4 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-fitzwilliam-street-car-park-sheffield-4-uk) - Type 2 22 kW · Fitzwilliam Street, Sheffield City Centre
- [Pod Point New Era Student Living](https://ampmap.co.uk/charger/pod-point-new-era-student-living-uk) - Type 2 3 kW · 34 Boston Street Highfield · From 30p/kWh
- [Broomspring Lane Car Park, Sheffield 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-broomspring-lane-car-park-sheffield-1-uk) - Type 2 22 kW · 90 Broomspring Lane, Broomhall

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ncp-estate-7-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: NCP Estate (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
