Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

NCP Estate · EV charging site

NCP Estate

Bloomsbury Square, Soho, WC1A 2RJ

NCP Estate is an EV charging site in Soho, Greater London, run by NCP Estate and open 24 hours a day. Both of its sockets are 22 kW Type 2. 184 other charging sites are listed within a mile, and the nearest site with 50 kW or more is (Taxis Only) Russell Square (North West side) (ESB Energy), 0.3 miles away.

Status

Not reporting

Checking status…

VerifiedLive status and details from NCP Estate’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectorsStatus unknown
Bloomsbury 1Status unknown
Bloomsbury 2Status unknown

Site information

Operator
NCP Estate
Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
Bloomsbury 1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at NCP Estate?

Up to 22 kW AC via Type 2.

How many charging sockets does NCP Estate have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is NCP Estate open 24/7?

Yes - NCP Estate is open 24 hours a day, 7 days a week.

Who operates NCP Estate?

NCP Estate is on the NCP Estate network.

Where is the nearest charger with 50 kW or more to NCP Estate?

(Taxis Only) Russell Square (North West side) (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at NCP Estate?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NCP Estate?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at NCP Estate?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: NCP Estate · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.