# Nene Park Trust

Web page: https://ampmap.co.uk/charger/nene-park-trust-uk

Nene Park Trust is an EV charging site in Peterborough, run by Nene Park Trust and open 24 hours a day. All 26 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 101 charging sessions here over the last 30 days.

## Status

26 of 26 open at 22 Nov 2026, 16:39 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Ferry Meadows in Nene Park, PE2 5UU
- **Area:** Peterborough, United Kingdom
- **Coordinates (latitude, longitude):** 52.56477, -0.31564

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 26 | Not listed | 26 free |

## Site information

- **Operator:** Nene Park Trust
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Nene Park Trust?

Up to 7 kW AC via Type 2.

### How many charging sockets does Nene Park Trust have?

26 charging sockets: 26 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Nene Park Trust open 24/7?

Yes - Nene Park Trust is open 24 hours a day, 7 days a week.

### When is Nene Park Trust busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is Nene Park Trust?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 101 observed charging sessions.

### Who operates Nene Park Trust?

Nene Park Trust is on the Nene Park Trust network.

### How long does a Tesla Model Y Long Range take to charge at Nene Park Trust?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nene Park Trust?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nene Park Trust?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peterborough](https://ampmap.co.uk/chargers/united-kingdom/peterborough/peterborough)
- [Cheapest charging in Peterborough](https://ampmap.co.uk/chargers/united-kingdom/peterborough/peterborough/cheapest)

## Chargers near this site

- [Westpoint](https://ampmap.co.uk/charger/monta-aps-westpoint-1-uk) - Type 2 22 kW · PE2 6GB
- [Starbucks Ortongate · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-starbucks-ortongate-uk) - CCS 50 kW, CHAdeMO 50 kW · Paxton Road
- [Ortongate Shopping Centre, Peterborough · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-ortongate-shopping-centre-uk) - CCS 50 kW, CHAdeMO 50 kW · Orton Goldhay · From 89p/kWh
- [Ortongate Shopping Centre · Evolt](https://ampmap.co.uk/charger/evolt-network-ortongate-shopping-centre-uk) - CHAdeMO 50 kW, Type 2 50 kW · Ortongate Shopping Centre
- [Best Western Plus, Orton Hall Hotel & Spa · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-best-western-plus-orton-hall-hotel-and-spa-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · The Village,
- [Pod Point Dragonfly Hotel - Peterborough](https://ampmap.co.uk/charger/pod-point-dragonfly-hotel-peterborough-2-uk) - Type 2 7 kW · Thorpe Meadows · From 69.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nene-park-trust-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Nene Park Trust (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
